ExxonMobil Starts Production at New Guyana Oil Project

by Adedotun Oyeniyi

KEY POINTS


  • ExxonMobil has started production at the Uaru project, raising Guyana’s installed oil production capacity to 1.1 million barrels per day.
  • The Errea Wittu FPSO has a production capacity of 250,000 barrels per day and is expected to reach that level in the first quarter of 2027.
  • Uaru is the fifth development in the offshore Stabroek Block, where ExxonMobil operates alongside Hess and CNOOC.

US energy giant ExxonMobil has commenced production at its Uaru offshore oil development in Guyana, increasing the country’s installed oil production capacity to 1.1 million barrels per day.

The project is the fifth development in the offshore Stabroek Block, one of the world’s most productive offshore oil regions.

Production is being handled by the Errea Wittu floating production, storage and offloading (FPSO) vessel, which has a designed capacity of 250,000 barrels per day.

The vessel joins four other FPSOs already operating in the Stabroek Block: Destiny, Unity, Prosperity and ONE GUYANA.

ExxonMobil said Errea Wittu is expected to reach its initial production capacity of 250,000 barrels per day in the first quarter of 2027.

The FPSO also has storage capacity for two million barrels of oil.

The company said the vessel was designed to deliver strong operational performance, with attention to safety, cost efficiency and emissions reduction.

ExxonMobil highlights Guyana’s growing oil industry

ExxonMobil Upstream Company President Dan Ammann described the commencement of production as another major milestone for Guyana and the company.

He said Guyana had become one of the world’s fastest-growing and most important emerging sources of energy supply in just over a decade.

Ammann attributed the increase in production capacity to the country’s substantial offshore oil resources, cooperation between ExxonMobil and the Guyanese government, and contributions from thousands of local workers.

The Uaru development further expands activity in the Stabroek Block, which has become central to Guyana’s emergence as a major oil producer.

ExxonMobil recently made a final investment decision on the Longtail development, which will become the eighth project in the block.

Project supports local businesses and employment

ExxonMobil said it and its partners had spent more than $3.9 billion with Guyanese suppliers since 2015.

The spending has supported local businesses, workforce development and wider economic activity in the country.

The Errea Wittu FPSO also marks the entry of Japanese offshore engineering company MODEC into the Guyanese market. The company brings experience from its operations in Brazil.

ExxonMobil and partners share ownership

ExxonMobil Guyana Limited operates the Stabroek Block and holds a 45% interest in the project.

Hess Guyana Exploration Limited owns 30%, while CNOOC Petroleum Guyana Limited holds the remaining 25%.

With Uaru now producing and the Errea Wittu FPSO expected to reach its full initial capacity in early 2027, Guyana’s offshore oil industry is set for further expansion as ExxonMobil advances additional developments in the Stabroek Block.

You may also like